Production Resource Management

Objective

The Production Resource Management option allows operations management teams to keep the production resource reference list (code, description, unit of measurement, and maximum daily threshold) up to date, which is used to plan work orders, customer orders, requisitions, and time-and material-jobs. In this way, the planned load for each resource can be compared with the actual daily capacity available.

 

Steps

  maestro* > Projects > Project Costing > Production Resources > Production Resource Management (Web)

 

Creating a Production Resource

  1. Click the New icon.
  2. Enter the required information in the Main Fields tab:

 

Fields followed by the * character are mandatory fields.

Field

Description

Code*

Code for the production resource.

Description

Description that identifies the production resource.

Mode

Allows specifying the tracking mode in which the load and the maximum threshold for the production resource are expressed. Available values:

  • 1 - Hour (default value)
  • 2 - Quantity
  • 3 - Unit

Maximum Threshold

Allows to set an upper limit on the daily scheduleable load for the production resource.

NOTE: The value must be between 0.00 and 99.00.

  1. Click the Save icon.

 